top of page
Picture3.jpg

victoria station

manchester

The steelwork to the front external canopy was dismantled and transported to our workshop.

 

All steelwork was shot blasted and coated with a PPG Network Rail 25 Year Paint specification.

Picture1.jpg
bottom of page